Container Terminal – Port of Moin.

Container Terminal – Port of Moin.

Supervision of the building works during phase 2 of the Container Terminal with capacity for 4 thousand containers of refrigerated freight. Wharf length of 650 meters, turning basin of 450 meters, administrative building and maintenance shop, among others.

Work supervision is rendered during phase 2 of the terminal construction, consisting of: 650 meters long, 14.5 meters deep wharf, 450 meters long turning basin and capacity for 4,000 containers of refrigerated freight.

In addition to the administrative building, the workshop, the maintenance building, cafeteria, container and equipment repair area, container reception and dispatch area, washing area, container yard, treatment plant, and an electric substation.

40,0 Ha

2015-2018